Quote:
Originally Posted by FasterTraffic
I'd like to see your progress on this, DAB.
|
i'll keep posting as i have more to show. plan is to do the rest of the holes tomorrow, then 800" of edge banding, then cut the tops and bottoms, then cut the top and bottom and center cleats (used to attach the bookcases to the wall), and more edge banding for exposed edges for them, then assembly with pocket screws. then build the common base, get it leveled, attach it to the wall, place cases in place, and then cut a shit load of shelves (which also need edge banding - i hope i have enough, if not, i'll have to order more, they didn't have any at the lumber yard
)
should be done next week some time, allowing for other things i have to get done around the Casa.